Germany · Generation facilities

He Dreiht offshore wind farm

공식 원천의 전력 객체 · Under construction

Project stage · source basis
Under construction · under_construction
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · DEU · primary:8a974dfd028b29231680c8b4

He Dreiht offshore wind farm

Generation facilities · Under construction

Metric or conditionSource valueBasis, scope and stage
generation_nameplate_capacity960 MWgeneration nameplate capacity · generation project · Under construction
As-of date Not stated
Sources EV-15c77726675ef4971c9ebf56
Detailed source fields
Original source fieldPublished value or condition
source_record_idhe-dreiht

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
www.enbw.com ↗

Data Source Not stated · Retrieved 2026-10-05

www.enbw.com

Source location article body

Sources EV-15c77726675ef4971c9ebf56
Evidence SHA-256 3a08f546d029952ab36253ba381054550bdb1ac450aa7c1088e1f0da6a8cf53f · raw_http_response

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel