Arkwright
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ee0fb3de6277c5a32448a622 |
| MW Increase / Decrease | 57 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ee0fb3de6277c5a32448a622 |
| Cumulative Total Capacity (MW) | 57 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ee0fb3de6277c5a32448a622 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Arkwright |
| Customer Name | ARLINGTON (GROUP SERVICES) LIMITED |
| Connection Site | Chesterfield 400kV Substation (Not yet constructed) |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 57.00 |
| Cumulative Total Capacity (MW) | 57.00 |
| MW Effective From | 2034-10-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000TPIbAAO |
| Project Number | PRO-003248 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:80 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:80
Sources EV-ee0fb3de6277c5a32448a622Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 f7036f9024c84fcdc9afbd7098e751114f8ce453a22715aeda2ea4162a59f840
Usage terms NESO Open Data Licence
