Arkwright
接入登记 · scoping
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-ee0fb3de6277c5a32448a622 |
| MW Increase / Decrease | 57 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-ee0fb3de6277c5a32448a622 |
| Cumulative Total Capacity (MW) | 57 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-ee0fb3de6277c5a32448a622 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Arkwright |
| Customer Name | ARLINGTON (GROUP SERVICES) LIMITED |
| Connection Site | Chesterfield 400kV Substation (Not yet constructed) |
| Stage | 未获取 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 57.00 |
| Cumulative Total Capacity (MW) | 57.00 |
| MW Effective From | 2034-10-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000TPIbAAO |
| Project Number | PRO-003248 |
| Gate | 未获取 |
| 原文状态 | Scoping |
| source_record_id | csv:row:80 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:80
依据 EV-ee0fb3de6277c5a32448a622资料SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 f7036f9024c84fcdc9afbd7098e751114f8ce453a22715aeda2ea4162a59f840