Bicker Fen 2 Solar
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d9b7f3428e363b7aff7377e3 |
| MW Increase / Decrease | 50 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d9b7f3428e363b7aff7377e3 |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d9b7f3428e363b7aff7377e3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bicker Fen 2 Solar |
| Customer Name | AGR SOLAR 3 LIMITED |
| Connection Site | Bicker Fen 400kV Substation |
| Stage | 1.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2026-07-27 |
| Project Status | Awaiting Consents |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005itRQAQ |
| Project Number | PRO-001046-1 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:187 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:187
Sources EV-d9b7f3428e363b7aff7377e3Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a80e0229c6257e4e403c94374f99a172004d2fe17e35811233f7ae26a9497aed
Usage terms NESO Open Data Licence