United Kingdom · Grid connection register

Bankside BESS

공식 원천의 전력 객체 · under construction or commissioning

Project stage · source basis
Stage requires verification · under_construction_or_commissioning
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Bankside BESS

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-700d66ed12a0f8527be38c99
MW Increase / Decrease43 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-700d66ed12a0f8527be38c99
Cumulative Total Capacity (MW)43 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-700d66ed12a0f8527be38c99
Detailed source fields
Original source fieldPublished value or condition
Project NameBankside BESS
Customer NameFALKIRK POWER LTD
Connection SiteBainsford 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease43.00
Cumulative Total Capacity (MW)43.00
MW Effective From2025-11-24
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iWYQAY
Project NumberPRO-002151
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:124

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:124

Sources EV-700d66ed12a0f8527be38c99
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5e0ce2ef58ec55ac5064e3c722bb1c0ad1f817ee74d361810bdb576442af9c44

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel