Beddington 2 BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7157fcbc7b40c8d6d07e4e0d |
| MW Increase / Decrease | 240 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7157fcbc7b40c8d6d07e4e0d |
| Cumulative Total Capacity (MW) | 240 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7157fcbc7b40c8d6d07e4e0d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Beddington 2 BESS |
| Customer Name | Bluestone Energy Ltd |
| Connection Site | London South Connection Node A 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 240.00 |
| Cumulative Total Capacity (MW) | 240.00 |
| MW Effective From | 2037-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011zPIAAY |
| Project Number | PRO-003577 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:142 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:142
Sources EV-7157fcbc7b40c8d6d07e4e0dEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a8af7e0d6b41acc7d92d13905c1796c435ea6a5de114b68a8bbd4be883c64290
Usage terms NESO Open Data Licence