Arecleoch
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-84eddadfd905951eacbaabb1 |
| MW Increase / Decrease | 216 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-84eddadfd905951eacbaabb1 |
| Cumulative Total Capacity (MW) | 330 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-84eddadfd905951eacbaabb1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Arecleoch |
| Customer Name | SCOTTISHPOWER RENEWABLES (UK) LIMITED |
| Connection Site | Arecleoch 132/33kV |
| Stage | 2.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 216.00 |
| Cumulative Total Capacity (MW) | 330.00 |
| MW Effective From | 2032-06-15 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005itIQAQ |
| Project Number | PRO-000012-2 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:78 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:78
Sources EV-84eddadfd905951eacbaabb1Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 33ab499eefbe6d05f5ab134a3452e4b6e356b056a2e0cd606d18ee85b7ed0dbc
Usage terms NESO Open Data Licence