United Kingdom · Grid connection register

BOOM Power Llanbabo Generation

공식 원천의 전력 객체 · consented

Project stage · source basis
Stage requires verification · consented
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

BOOM Power Llanbabo Generation

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-638bdc7bae49c83e7bd74311
MW Increase / Decrease300 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-638bdc7bae49c83e7bd74311
Cumulative Total Capacity (MW)300 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-638bdc7bae49c83e7bd74311
Detailed source fields
Original source fieldPublished value or condition
Project NameBOOM Power Llanbabo Generation
Customer NameCarrog Storage Facility Limited
Connection SiteWylfa 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease300.00
Cumulative Total Capacity (MW)300.00
MW Effective From2028-10-31
Project StatusConsents Approved
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005ihHQAQ
Project NumberPRO-001540
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:228

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:228

Sources EV-638bdc7bae49c83e7bd74311
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 333c53305f88489b7c5f147f2e6535f34383ae7b9687c13dda06ba112646d3b8

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel