Bicker Fen 1 Solar
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-058429b2cc69a4fec99c4ec4 |
| MW Increase / Decrease | 50 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-058429b2cc69a4fec99c4ec4 |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-058429b2cc69a4fec99c4ec4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bicker Fen 1 Solar |
| Customer Name | AGR SOLAR 2 LIMITED |
| Connection Site | Bicker Fen 400kV Substation |
| Stage | 1.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2025-09-26 |
| Project Status | Awaiting Consents |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005iaOQAQ |
| Project Number | PRO-001034-1 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:185 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:185
Sources EV-058429b2cc69a4fec99c4ec4Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 d34088cc30b2debd4db076352e597f4fcb9affabb4c3262197e93ccf51d5bfb4
Usage terms NESO Open Data Licence
