Bankhead 25MW BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f8671397f9b36845c16687ed |
| MW Increase / Decrease | 25 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f8671397f9b36845c16687ed |
| Cumulative Total Capacity (MW) | 25 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f8671397f9b36845c16687ed |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bankhead 25MW BESS |
| Customer Name | GPC 1169 Ltd |
| Connection Site | Devonside 132/33kV |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 25.00 |
| Cumulative Total Capacity (MW) | 25.00 |
| MW Effective From | 2030-04-30 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011zKlAAI |
| Project Number | PRO-003574 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:122 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:122
Sources EV-f8671397f9b36845c16687edEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4bdb9cd3b5a3e977928fb97852a50719f39e417ee4ae0e1fe39a3c13b597d5bb
Usage terms NESO Open Data Licence
