Bewley BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1e10d17664ccf3bd97b18a6 |
| MW Increase / Decrease | 249 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1e10d17664ccf3bd97b18a6 |
| Cumulative Total Capacity (MW) | 249 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1e10d17664ccf3bd97b18a6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bewley BESS |
| Customer Name | Apatura Project 35 Ltd |
| Connection Site | Wearside Connection Node C 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 249.00 |
| Cumulative Total Capacity (MW) | 249.00 |
| MW Effective From | 2035-10-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000f6uBAAQ |
| Project Number | PRO-003993 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:178 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:178
Sources EV-e1e10d17664ccf3bd97b18a6Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e19e07d0a0a483d517c0d1ce10ab20783f2c209bf5739dbe02a4afb2c9411057
Usage terms NESO Open Data Licence