Battery Point BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b37d068278c65f7d6f53bd2b |
| MW Increase / Decrease | 25 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b37d068278c65f7d6f53bd2b |
| Cumulative Total Capacity (MW) | 25 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b37d068278c65f7d6f53bd2b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Battery Point BESS |
| Customer Name | Point and Sandwick Power Limited |
| Connection Site | Stornoway GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 25.00 |
| Cumulative Total Capacity (MW) | 25.00 |
| MW Effective From | 2030-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005iMMQAY |
| Project Number | PRO-002335 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:134 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:134
Sources EV-b37d068278c65f7d6f53bd2bEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6ac3390674a5bb942fe2df8b12da9fe0071b1fa408b4d570aa15e4fe7a469f39
Usage terms NESO Open Data Licence