Ardleigh Solar & BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-6b0abebeb2586ad979fd46a3 |
| MW Increase / Decrease | 600 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-6b0abebeb2586ad979fd46a3 |
| Cumulative Total Capacity (MW) | 600 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-6b0abebeb2586ad979fd46a3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Ardleigh Solar & BESS |
| Customer Name | Nembus BESS Limited |
| Connection Site | Hadleigh 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 600.00 |
| Cumulative Total Capacity (MW) | 600.00 |
| MW Effective From | 2032-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e0000010wVFAAY |
| Project Number | PRO-002644 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:74 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:74
Sources EV-6b0abebeb2586ad979fd46a3Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 848baaecddfb04fb0113cdec6e7b83e64bd8cdfc8c2cb702582022c7854eb51d
Usage terms NESO Open Data Licence