Ayr Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-49688c400aca66d03387abba |
| MW Increase / Decrease | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-49688c400aca66d03387abba |
| Cumulative Total Capacity (MW) | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-49688c400aca66d03387abba |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Ayr Farm |
| Customer Name | Braston New Energy Limited |
| Connection Site | Ayr Farm Collector Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 500.00 |
| Cumulative Total Capacity (MW) | 500.00 |
| MW Effective From | 2028-05-26 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011zmYAAQ |
| Project Number | PRO-003596 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:102 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:102
Sources EV-49688c400aca66d03387abbaEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 efefd6950bef7f76d7ad5d2c29df29db56030bf21a523a0c6c880bf95d8056fc
Usage terms NESO Open Data Licence