Bicker Drove
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e5db5577ff4097cb47c11e13 |
| MW Increase / Decrease | 400 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e5db5577ff4097cb47c11e13 |
| Cumulative Total Capacity (MW) | 400 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e5db5577ff4097cb47c11e13 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bicker Drove |
| Customer Name | REWE 1 LIMITED |
| Connection Site | Navenby 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 400.00 |
| Cumulative Total Capacity (MW) | 400.00 |
| MW Effective From | 2034-05-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000f4nZAAQ |
| Project Number | PRO-003874 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:183 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:183
Sources EV-e5db5577ff4097cb47c11e13Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a708bfa1a1509c920e95af7c0733aa7cd23655ac5613bc60088bf30cec195de8
Usage terms NESO Open Data Licence