Achies BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7545483def5174a259dfb36d |
| MW Increase / Decrease | 200 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7545483def5174a259dfb36d |
| Cumulative Total Capacity (MW) | 200 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7545483def5174a259dfb36d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Achies BESS |
| Customer Name | IGP ENERGY STORAGE 5 LIMITED |
| Connection Site | New Spittal 275kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 200.00 |
| Cumulative Total Capacity (MW) | 200.00 |
| MW Effective From | 2037-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0lJ9000000POVhIAO |
| Project Number | PRO-006050 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:18 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:18
Sources EV-7545483def5174a259dfb36dEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 128ba9d32316faf3fdca6d60cd9a128dbd6f495c0719e3d5a4ca596f651a9a21
Usage terms NESO Open Data Licence