Ardoch Farm Battery Storage
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-16bc9260395e9cc067196f63 |
| MW Increase / Decrease | 27 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-16bc9260395e9cc067196f63 |
| Cumulative Total Capacity (MW) | 27 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-16bc9260395e9cc067196f63 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Ardoch Farm Battery Storage |
| Customer Name | CAPBAL (KILWINNING) LIMITED |
| Connection Site | Kilwinning 132/33kV |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 27.00 |
| Cumulative Total Capacity (MW) | 27.00 |
| MW Effective From | 2026-04-30 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005iUVQAY |
| Project Number | PRO-002431 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:75 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:75
Sources EV-16bc9260395e9cc067196f63Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5a430903686c787c85edaf0334fe1c08895e1916aa8f5b842de8020dae211f7c
Usage terms NESO Open Data Licence