Bicker Fen 2 Solar
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-040e330d1e969958c68782c3 |
| MW Increase / Decrease | 7.01 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-040e330d1e969958c68782c3 |
| Cumulative Total Capacity (MW) | 57 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-040e330d1e969958c68782c3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bicker Fen 2 Solar |
| Customer Name | AGR SOLAR 3 LIMITED |
| Connection Site | Bicker Fen 400kV Substation |
| Stage | 2.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 7.01 |
| Cumulative Total Capacity (MW) | 57.00 |
| MW Effective From | 2033-04-01 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005itRQAQ |
| Project Number | PRO-001046-2 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:188 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:188
Sources EV-040e330d1e969958c68782c3Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 af4997fb4c8dfc80d1e7a3294b3a768b4e5ac2582faf80fe5ae1e9e28189e5c4
Usage terms NESO Open Data Licence