Bilbo Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c428e6b4527e10304e9dbfde |
| MW Increase / Decrease | 42.1 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c428e6b4527e10304e9dbfde |
| Cumulative Total Capacity (MW) | 67.1 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c428e6b4527e10304e9dbfde |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bilbo Farm |
| Customer Name | LEL BILBO SOLAR LIMITED |
| Connection Site | Strichen 132/33kV GSP Substation |
| Stage | 2.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 42.10 |
| Cumulative Total Capacity (MW) | 67.10 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005iXhQAI |
| Project Number | PRO-001301-2 |
| Gate | 2 |
| Original text | Scoping |
| source_record_id | csv:row:197 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:197
Sources EV-c428e6b4527e10304e9dbfdeEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3bab99dfe48a61681e7577d1d0736e1fe657f95d25f86796de05651c6cf8226b
Usage terms NESO Open Data Licence
