Biggleswade High Impact Green Energy Hub
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-fa6bd70a3c498578e3444a0a |
| MW Increase / Decrease | 1000 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-fa6bd70a3c498578e3444a0a |
| Cumulative Total Capacity (MW) | 1000 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-fa6bd70a3c498578e3444a0a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Biggleswade High Impact Green Energy Hub |
| Customer Name | TELIS ENERGY UK LIMITED |
| Connection Site | Biggleswade 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 1000.00 |
| Cumulative Total Capacity (MW) | 1000.00 |
| MW Effective From | 2034-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore |
| Project ID | a0l8e0000012gscAAA |
| Project Number | PRO-004477 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:194 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:194
Sources EV-fa6bd70a3c498578e3444a0aEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c82414c2ca7339a70c95944c19816d81f930fbd7fdc0e25d963f34ac386d6855
Usage terms NESO Open Data Licence