Barton Hill
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 20.88 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-e21f13760ca7a80e66168150 |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-e21f13760ca7a80e66168150 |
| Cumulative Total Capacity (MW) | 20.88 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-e21f13760ca7a80e66168150 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Barton Hill |
| Customer Name | VIRIDIS 178 LIMITED |
| Connection Site | Abham GSP |
| Stage | Not obtained |
| MW Connected | 20.88 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 20.88 |
| MW Effective From | Not obtained |
| Project Status | Built |
| Agreement Type | Embedded |
| HOST TO | NGET |
| Plant Type | CHP (Combined Heat and Power) |
| Project ID | a0l4L0000005iUsQAI |
| Project Number | PRO-000024 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:133 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:133
Sources EV-e21f13760ca7a80e66168150Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 2cb5bf02f5ca6161e989780d81b63db4875456967c959a2c0cd2c2e331cd455f
Usage terms NESO Open Data Licence