Balinoe Wind Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b27010edcbd294ac6f87550e |
| MW Increase / Decrease | 160.6 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b27010edcbd294ac6f87550e |
| Cumulative Total Capacity (MW) | 160.6 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b27010edcbd294ac6f87550e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balinoe Wind Farm |
| Customer Name | RWE Renewables UK Onshore Wind Limited |
| Connection Site | Balinoe 132kV substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 160.60 |
| Cumulative Total Capacity (MW) | 160.60 |
| MW Effective From | 2034-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System;Wind Onshore |
| Project ID | a0l8e0000012kqNAAQ |
| Project Number | PRO-004776 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:112 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:112
Sources EV-b27010edcbd294ac6f87550eEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b682474aee94d1e4b1c9471927b5f19de176a373f4a39b11bfde08c06eaf8775
Usage terms NESO Open Data Licence
