Beinn an Tuirc 3
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 50 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-3a7cbb6515376bc4e68d2f5a |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-3a7cbb6515376bc4e68d2f5a |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-3a7cbb6515376bc4e68d2f5a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Beinn an Tuirc 3 |
| Customer Name | SCOTTISHPOWER RENEWABLES (UK) LIMITED |
| Connection Site | Carradale 1 GSP |
| Stage | Not obtained |
| MW Connected | 50.00 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | Not obtained |
| Project Status | Built |
| Agreement Type | Embedded |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005iUvQAI |
| Project Number | PRO-000029 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:147 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:147
Sources EV-3a7cbb6515376bc4e68d2f5aEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 37edf5b6cd681cd0ab3d0b37cb306d1746cd5e5181c9ffc3ba8f9b504e6f71ec
Usage terms NESO Open Data Licence