MeyGen Tidal
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-723c41938cf7295989fcb707 |
| MW Increase / Decrease | 83 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-723c41938cf7295989fcb707 |
| Cumulative Total Capacity (MW) | 154 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-723c41938cf7295989fcb707 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | MeyGen Tidal |
| Customer Name | Meygrid Limited |
| Connection Site | Gills Bay GSP |
| Stage | 3.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 83.00 |
| Cumulative Total Capacity (MW) | 154.00 |
| MW Effective From | 2028-04-01 |
| Project Status | Awaiting Consents |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System;Tidal |
| Project ID | a0l4L0000005isuQAA |
| Project Number | PRO-000336-3 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:1393 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:1393
Sources EV-723c41938cf7295989fcb707Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 9cf56b0fdfe7d95cd1322018252e410b181fd93958882b8cd1223655d5c37536
Usage terms NESO Open Data Licence
