United Kingdom · Grid connection register

Beinn an Tuirc 2

공식 원천의 전력 객체 · built

Project stage · source basis
Stage requires verification · built
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Beinn an Tuirc 2

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected43.7 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ddaaa7614b8209464314c29f
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ddaaa7614b8209464314c29f
Cumulative Total Capacity (MW)43.7 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ddaaa7614b8209464314c29f
Detailed source fields
Original source fieldPublished value or condition
Project NameBeinn an Tuirc 2
Customer NameSCOTTISHPOWER RENEWABLES (UK) LIMITED
Connection SiteCarradale 1 GSP
StageNot obtained
MW Connected43.70
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)43.70
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeEmbedded
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iUuQAI
Project NumberPRO-000028
GateNot obtained
Original textBuilt
source_record_idcsv:row:146

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:146

Sources EV-ddaaa7614b8209464314c29f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5cdb032a7ad2bbd3011e9f477a032a98f40d5e8e9de1edc56122434311b4020e

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel