Balgonie Farm BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-87bfb836b5a89ef820921bf1 |
| MW Increase / Decrease | 49.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-87bfb836b5a89ef820921bf1 |
| Cumulative Total Capacity (MW) | 49.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-87bfb836b5a89ef820921bf1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balgonie Farm BESS |
| Customer Name | ELGIN ENERGY ES CO LIMITED |
| Connection Site | Abernethy 2 400/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 49.90 |
| Cumulative Total Capacity (MW) | 49.90 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0lJ9000000PDmpIAG |
| Project Number | PRO-005015 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:35 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:35
Sources EV-87bfb836b5a89ef820921bf1Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 4a2e84ab449c1551f3b04ccf35fd92bdf14e67ca0a11e9dd04017955b1ce5a9e
Usage terms NESO Open Data Licence