Barachander Wind Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-01342735c3bef4e1269bae8e |
| MW Increase / Decrease | 66 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-01342735c3bef4e1269bae8e |
| Cumulative Total Capacity (MW) | 66 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-01342735c3bef4e1269bae8e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Barachander Wind Farm |
| Customer Name | GreenPower (Barachander) Ltd |
| Connection Site | TAYNUILT 132/33KV GRID SUPPLY POINT SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 66.00 |
| Cumulative Total Capacity (MW) | 66.00 |
| MW Effective From | 2034-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l8e000000f6u1AAA |
| Project Number | PRO-003991 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:46 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:46
Sources EV-01342735c3bef4e1269bae8eEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a7c07f84997c64647243de0aaac60b46318ef5360491d385f93a169504011db5
Usage terms NESO Open Data Licence
