Cairds Hill
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d6f183e46ae84e1df7034d9 |
| MW Increase / Decrease | 16.8 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d6f183e46ae84e1df7034d9 |
| Cumulative Total Capacity (MW) | 16.8 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d6f183e46ae84e1df7034d9 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Cairds Hill |
| Customer Name | EDP RENEWABLES UK LIMITED |
| Connection Site | Keith 1 132/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 16.80 |
| Cumulative Total Capacity (MW) | 16.80 |
| MW Effective From | 2026-10-01 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005iTaQAI |
| Project Number | PRO-001382 |
| Gate | 2 |
| Original text | Scoping |
| source_record_id | csv:row:105 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:105
Sources EV-9d6f183e46ae84e1df7034d9Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 d360c00d1dd4c0013e0000bbd858f8b9b77ce67718fcd95703860abb0749c2a2
Usage terms NESO Open Data Licence
