Dupplin Solar
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f6297608660ac264d304eda3 |
| MW Increase / Decrease | 75 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f6297608660ac264d304eda3 |
| Cumulative Total Capacity (MW) | 75 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f6297608660ac264d304eda3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Dupplin Solar |
| Customer Name | TRIO POWER LIMITED |
| Connection Site | Burghmuir GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 75.00 |
| Cumulative Total Capacity (MW) | 75.00 |
| MW Effective From | 2035-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0lJ9000000POjjIAG |
| Project Number | PRO-006116 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:194 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:194
Sources EV-f6297608660ac264d304eda3Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2cf02ca503b1766a1c980b0363207b732961e8d458d5f233d1c56b7d778d6316
Usage terms NESO Open Data Licence
