Coulterfanny PV
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c524c3cee7aa843673e1d776 |
| MW Increase / Decrease | 0.17 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c524c3cee7aa843673e1d776 |
| Cumulative Total Capacity (MW) | 0.17 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c524c3cee7aa843673e1d776 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Coulterfanny PV |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Strichen GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 0.17 |
| Cumulative Total Capacity (MW) | 0.17 |
| MW Effective From | 2025-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e0000010wbtAAA |
| Project Number | PRO-002716 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:152 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:152
Sources EV-c524c3cee7aa843673e1d776Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 f9c8e3fbc4e79e8c9161023df44fd21e7ac0a717bebeefcd1e690aba9f2d94ad
Usage terms NESO Open Data Licence