CRAIGHEAD WIND FARM 132kV SUBSTATION
Connection-site name reference · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| source_record_id | CRAIGHEAD WIND FARM 132kV SUBSTATION |
No separate metric summary is available. Consult the detailed source fields.
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:501
Sources EV-d78d6c3c22f3b151dd423da5Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e8c304833b1dba2c818ebd1ae5f38de97f34e88c7fbe0fd482b25b17b8f238b0
Usage terms NESO Open Data Licence
