United Kingdom · Connection-site name reference

Bolney 400kV Substation

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Bolney 400kV Substation

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idBolney 400kV Substation

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 6items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:221

Sources EV-7cea336ba34eaa3b2e014448
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fe1cda1b83c92d9594197afd9428772228d08720423f17744d5e178436fcb434

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:222

Sources EV-1a629f727d59cf092d9c7297
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7d0aad50caf6753eeadcfd764ff44026db0c5d08347d5c487b5c2a29d53a3696

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:224

Sources EV-fd2c801b7fa92b5e37a076d5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 798bcf08ccb6ce9cb20a6ec12b073f12f978bdfb59e2805f277f16ac979a796c

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:226

Sources EV-0374ac4e95f1d5cd6097d9a2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1c2b0ab828c9c73cee7320a2ae3d605f9c0eccbb67ae915fd9f86a709b49450b

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1701

Sources EV-5a33d92c9f6b15cbae727afe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1213e834d0f77b4caf95be967f71644193cb26677b29accc2311adcabd29baa8

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1824

Sources EV-2f1198b85a0de46c244f4cd2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 53ae2a7f447fdec74f6c36fd073a4fb77ca4e497a3c876f58534c4a589424a6c

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel