United Kingdom · Connection-site name reference

Ayr GSP

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Ayr GSP

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idAyr GSP

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:29

Sources EV-fbb85679d99749818e285cc0
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a615ca19d7b90cc0042ff96d53ec9726f036c00f56da103bc1ea11e709d50630

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1168

Sources EV-71b6d1f3b9be2f32d54865da
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 2552d572b3989352f0c4404fe9e945be4d2e15dd1de2f94266fc46db05dc92fe

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel