154kV 북김제분기 지중T/L 건설사업
Power project · Construction project
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ef5fdfb5b1e7fd831b39db93 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| stable_project_id | kproj_f25b07f322196df2 |
| stable_project_key | prjtDef:233653:ESB |
| project_definition | 233653 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 북김제분기 지중T/L 건설사업 |
| project_name_list | 154kV 북김제분기 지중T/L 건설사업 |
| purpose | 북김제S/S 신설에 따른 계통연계 |
| project_region_detail | 전북특별자치도 김제시 |
| project_period_raw | 2024.07~2024.10 |
| project_scale_raw | XLPE1200㎟X4C, 0.1KM |
| responsible_office_raw | 중부건설본부/전북건설지사 |
| equipment_type | 지중송전 |
| headquarters | 중부건설본부 |
| office | 전북건설지사 |
| current_stage_raw | 계획확정-사업승인전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | Not obtained |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| Original text | 계획확정-사업승인전 |
| source_record_id | stable_project_id:kproj_f25b07f322196df2 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f25b07f322196df2
Sources EV-ef5fdfb5b1e7fd831b39db93Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 012d6668929e61b68d9fdbbc58293de9574c3e793b663852bdce554db3938a69
