154kV 논산#2 S/S 건설사업
Power project · Construction project
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e52d7c618b90ef93dc60cdbf |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| stable_project_id | kproj_d6999d9d8513f662 |
| stable_project_key | prjtDef:231683:ESB |
| project_definition | 231683 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 논산#2 S/S 건설사업 |
| project_name_list | 154kV 논산#2 변전소 건설사업 |
| purpose | 논산지역 신재생E 접속용량 확보 |
| project_region_detail | 충청남도 논산시 |
| project_period_raw | |
| project_scale_raw | 60MVA×2BANK (최종 4BANK) |
| responsible_office_raw | 중부건설본부/직할 |
| equipment_type | 변전 |
| headquarters | 중부건설본부 |
| office | 직할 |
| current_stage_raw | |
| snapshot_count | 1 |
| active_snapshot_count | 0 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | Not obtained |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| Original text | |
| source_record_id | stable_project_id:kproj_d6999d9d8513f662 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d6999d9d8513f662
Sources EV-e52d7c618b90ef93dc60cdbfEvidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 da73ba7affdc16a2000c6c8bac55498fa0d00ae384de33c430d0ee3f3f704551
