POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 논산#2 S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e52d7c618b90ef93dc60cdbf
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6999d9d8513f662
stable_project_keyprjtDef:231683:ESB
project_definition231683
first_region_codeESB
manual_source_formatfalse
project_name154kV 논산#2 S/S 건설사업
project_name_list154kV 논산#2 변전소 건설사업
purpose논산지역 신재생E 접속용량 확보
project_region_detail충청남도 논산시
project_period_raw
project_scale_raw60MVA×2BANK (최종 4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_90b9292a366d889d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_d6999d9d8513f662

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6999d9d8513f662

Sources EV-e52d7c618b90ef93dc60cdbf
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 da73ba7affdc16a2000c6c8bac55498fa0d00ae384de33c430d0ee3f3f704551
Source snapshots by date · KOR · kepco_planned

154kV 논산#2 S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_90b9292a366d889d
stable_project_idkproj_d6999d9d8513f662
source_key202609|231683|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 논산#2 변전소 건설사업
project_name_detail154kV 논산#2 S/S 건설사업
region_summary_raw충청남도 논산시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 논산지역 신재생E 접속용량 확보
Project region
  • 충청남도 논산시
Project period
사업 규모
  • 60MVA×2BANK (최종 4BANK)
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2564c4b62ff98607255225d11b116bc7021835f19bc2c2b98ccb3c281f5c59c764a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231683|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_90b9292a366d889d

Sources EV-d9cdda653411ef6aa9d0ad24
Evidence SHA-256 4c4b62ff98607255225d11b116bc7021835f19bc2c2b98ccb3c281f5c59c764a
행 SHA-256 dad246082f1f944556cd74d35353a0278445cbbdce20b3f46d43d5c653f88e0e
Source snapshots by date · KOR · kepco_planned

154kV 논산#2 S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6999d9d8513f662
stable_project_keyprjtDef:231683:ESB
project_definition231683
first_region_codeESB
manual_source_formatfalse
project_name154kV 논산#2 S/S 건설사업
project_name_list154kV 논산#2 변전소 건설사업
purpose논산지역 신재생E 접속용량 확보
project_region_detail충청남도 논산시
project_period_raw
project_scale_raw60MVA×2BANK (최종 4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_90b9292a366d889d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_d6999d9d8513f662

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6999d9d8513f662

Sources EV-e52d7c618b90ef93dc60cdbf
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 da73ba7affdc16a2000c6c8bac55498fa0d00ae384de33c430d0ee3f3f704551

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel