South Korea · Power project

154kV 대곡S/S 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 대곡S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7e2878bd4dc833417af2d787
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d05c9e3800dc494b
stable_project_keyprjtDef:231538:ESB
project_definition231538
first_region_codeESB
manual_source_formatfalse
project_name154kV 대곡S/S 건설사업
project_name_list154kV 대곡변전소 건설사업
purpose(일산, 능곡S/S 등) 공급능력 포화 및 부하분담 필요
project_region_detail경기도 고양시 덕양구
project_period_raw2025.08~2031.04
project_scale_raw154KV M.TR(45/60MVA)×2BANK
responsible_office_raw경인건설본부/직할
equipment_type변전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4b786ea8c1682351
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d05c9e3800dc494b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d05c9e3800dc494b

Sources EV-7e2878bd4dc833417af2d787
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6b3a3ae6a7493e28e72ec2323b91a3da81f3b681e0807a347eb532ac4e09fad0

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel