South Korea · Power project

154kV 고흥#4분기 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 고흥#4분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3c6b125b5c0819c3a0b41c12
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bfec460e71713427
stable_project_keyprjtDef:234722:ESB
project_definition234722
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥#4분기 전력구 건설사업
project_name_list154kV 고흥#4분기 전력구 건설사업
purpose고흥지역의 전력공급을 위함.
project_region_detail전남광주통합특별시 고흥군
project_period_raw2024.06~2030.12
project_scale_rawTo be determined
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_81e0882b05a6f076
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bfec460e71713427

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bfec460e71713427

Sources EV-3c6b125b5c0819c3a0b41c12
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e949d8c49c4448736a6c59502f0c71d9263d716dc91323c3c8154ba066d1d815

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel