South Korea · Power project

154kV 고옥-득량T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 고옥-득량T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1114d7f46e9906baeb471619
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bfad09fbdf0bb47d
stable_project_keyprjtDef:232503:ESB
project_definition232503
first_region_codeESB
manual_source_formatfalse
project_name154kV 고옥-득량T/L 건설사업
project_name_list154kV 고옥-득량T/L 건설사업
purpose재생에너지 연계용량 확보 및 고흥S/S 단일계통해소
project_region_detail전남광주통합특별시 보성군
project_period_raw2020.03~2026.12
project_scale_rawA/AW 410㎟×2B×2C×15.4KM, 철탑 39기
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_09492982b8daf20c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_bfad09fbdf0bb47d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bfad09fbdf0bb47d

Sources EV-1114d7f46e9906baeb471619
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b67d41e790f9b28d51da4b51a9ceadf3090d3ea6cf8a2d2adf04e8bed86e660d

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel