South Korea · Power project

154kV 남대구-효목 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 남대구-효목 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f0d68c45d97941e85bea24e6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_95c6c6dcda051e09
stable_project_keyprjtDef:233516:ESB
project_definition233516
first_region_codeESB
manual_source_formatfalse
project_name154kV 남대구-효목 지중T/L 건설사업
project_name_list154kV 남대구-효목 지중 송전선로 건설사업
purpose대구지역 154KV 계통보강(신경산-대구권)
project_region_detail대구광역시 수성구
project_period_raw2027.03~2028.01
project_scale_raw154㎸ XLPE 1,200㎟, 2C × 0.90㎞
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type지중송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4c501020a08603d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_95c6c6dcda051e09

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_95c6c6dcda051e09

Sources EV-f0d68c45d97941e85bea24e6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 249b0b14b15f19788b5d02328ee25d7948762f11e6c8b49dee530c3d9976b2da

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel