South Korea · Power project

154kV 도고분기 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 도고분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-dabbc87b3a56e3c39c43f372
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7b7d20f0b0667e55
stable_project_keyprjtDef:234731:ESB
project_definition234731
first_region_codeESB
manual_source_formatfalse
project_name154kV 도고분기 전력구 건설사업
project_name_list154kV 도고분기 전력구 건설사업
purpose도고 일반산업단지 조성 등 신규부하 공급능력 확보
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2024.04~2028.02
project_scale_raw154KV XLPE 2000X4C, L=1.0KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1488716bec26c168
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_7b7d20f0b0667e55

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7b7d20f0b0667e55

Sources EV-dabbc87b3a56e3c39c43f372
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3c6c8f1665965cac5e0a6dcc7d644aac65dcb5b108da8d0e608a675741d65dfb

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel