154kV 군장-비응#4 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 군장-비응#4 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-55a1ce8c27485ea48e38053d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_35b6930477f4c504
stable_project_keyprjtDef:234374:ESB
project_definition234374
first_region_codeESB
manual_source_formatfalse
project_name154kV 군장-비응#4 전력구 건설사업
project_name_list군산지역 전기공급시설 전력구공사(군장-서비응)
purpose새만금 국가산업단지 신규 부하 전력공급
project_region_detail전북특별자치도 군산시
project_period_raw2025.01~2028.09
project_scale_raw2회선 관로 4.4KM, 전력구 0.9KM, 압입 0.1KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f616eb3ba3dc1b7c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_35b6930477f4c504

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_35b6930477f4c504

Sources EV-55a1ce8c27485ea48e38053d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8ff20b1f27943e1670e2d63f56eb2358578400b31560f2905884efc13089c6e4

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel