South Korea · Power project

154kV 번천분기T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 번천분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-98ac65a1c52f06dda259bb81
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_32f5012453c700f8
stable_project_keyprjtDef:232552:ESB
project_definition232552
first_region_codeESB
manual_source_formatfalse
project_name154kV 번천분기T/L 건설사업
project_name_list154kV 번천분기 송전선로 건설사업
purpose경기도 광주지역 신규 공급능력 확보
project_region_detail경기도 광주시
project_period_raw2024.06~2026.12
project_scale_rawACSR410(B)×2C, 0.75KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0eea985f2979e488
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_32f5012453c700f8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_32f5012453c700f8

Sources EV-98ac65a1c52f06dda259bb81
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 33dd6258a4735e7833294586adebb0625cdaf1d4294ee6f6431e2bb16b918c56

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel