South Korea · Power project

154kV 북성주분기 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 북성주분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-23afc07593c46782c4321d01
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2137e91ec1e12159
stable_project_keyprjtDef:233711:ESB
project_definition233711
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주분기 지중T/L 건설사업
project_name_list154kV 북성주분기 지중T/L 건설사업
purpose성주3산단 전력공급 및 인근 변전소 과부하 해소
project_region_detail경상북도 성주군
project_period_raw2026.01~2027.01
project_scale_raw154㎸ XLPE 2,500㎟ 4C × 0.3㎞
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type지중송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bb4b5359663f82af
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_2137e91ec1e12159

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2137e91ec1e12159

Sources EV-23afc07593c46782c4321d01
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 27d3de972ce70e3a4a3e561f1e31adc9cbbc377680e11cb446f94eb11a31001b

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel