United States of America · Generation facilities

TPE MD PR270

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Pivot Energy
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
38.766085, -76.7368

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

TPE MD PR270

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)13.8 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-69c489a9d950230c9f056ca9
Detailed source fields
Original source fieldPublished value or condition
Utility ID65539
Utility NamePivot Energy
Plant Code69769
Plant NameTPE MD PR270
Street Address9004 Allentown Road
CityFort Washington
StateMD
Zip20744
CountyPrince Georges
Latitude38.766085
Longitude-76.7368
NERC RegionRFC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerPotomac Electric Power Co
Transmission or Distribution System Owner ID15270
Transmission or Distribution System Owner StateMD
Grid Voltage (kV)13.8
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:16676

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:16676

Sources EV-69c489a9d950230c9f056ca9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bd39a4d9df9fa0779d9344040b8a7542f582d901f54966fb5a524596542a0e8b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel