United States of America · Generation facilities

Bright Future

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
OneEnergy, Inc.
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.961373, -92.443419

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Bright Future

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)12.47 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-eadb873b3d5e6dce16dd01f5
Detailed source fields
Original source fieldPublished value or condition
Utility ID66783
Utility NameOneEnergy, Inc.
Plant Code69486
Plant NameBright Future
Street Address1936 Engineer Way
CityHammond
StateWI
Zip54015
CountySt Croix
Latitude44.961373
Longitude-92.443419
NERC RegionMRO
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number25-746-000
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerSt Croix Electric Coop
Transmission or Distribution System Owner ID17868
Transmission or Distribution System Owner StateWI
Grid Voltage (kV)12.47
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:16400

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:16400

Sources EV-eadb873b3d5e6dce16dd01f5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 aafd8ddb88176743f18b81f20fc359eb0f9e8fbfc62a9915b0a024a230911140

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel