United States of America · Generation facilities

Adelite Solar, LLC

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Birch Creek Development
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
39.75533, -94.012342

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Adelite Solar, LLC

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)34.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-33049b644da719a4f16efca9
Detailed source fields
Original source fieldPublished value or condition
Utility ID65654
Utility NameBirch Creek Development
Plant Code68927
Plant NameAdelite Solar, LLC
Street AddressNW State Hwy CC
CityHamilton
StateMO
Zip64644
CountyCaldwell
Latitude39.75533
Longitude-94.012342
NERC RegionMRO
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Name of Water SourceNA
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket NumberER25-382
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerUnion Electric Co - (MO)
Transmission or Distribution System Owner ID19436
Transmission or Distribution System Owner StateMO
Grid Voltage (kV)34.5
Energy StorageN
Natural Gas StorageX
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:15852

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:15852

Sources EV-33049b644da719a4f16efca9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 45f0b4126311d037a9661c4c1588b96fdb52ac60d6a51e6d0b94cdb6a0499343

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER