United States of America · Generation facilities

Gratiot Solar Park

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.436999, -84.498447

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Gratiot Solar Park

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)138 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-e7e1d5455e0891096b5a9d72
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code68850
Plant NameGratiot Solar Park
Street Address5500 E Jefferson Road
CityBreckenridge
StateMI
Zip48615
CountyGratiot
Latitude43.436999
Longitude-84.498447
NERC RegionRFC
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Name of Water SourceNA
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerMichigan Electric Transmission Company,
Transmission or Distribution System Owner ID56163
Transmission or Distribution System Owner StateMI
Grid Voltage (kV)138
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:15778

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:15778

Sources EV-e7e1d5455e0891096b5a9d72
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1a4c14e505b56835626ed35e916c247e29a4b1337aef99462452812317e56524

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel