United States of America · Generation facilities

SR Magnolia

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
SR Magnolia, LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.856467, -88.674883

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

SR Magnolia

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)161 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-6be67b47d43d5409e85d4c90
Detailed source fields
Original source fieldPublished value or condition
Utility ID66933
Utility NameSR Magnolia, LLC
Plant Code68559
Plant NameSR Magnolia
Street AddressTBD
CityMonroe
StateMS
Zip39730
CountyMonroe
Latitude33.856467
Longitude-88.674883
NERC RegionSERC
Balancing Authority CodeTVA
Balancing Authority NameTennessee Valley Authority
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerTennessee Valley Authority
Transmission or Distribution System Owner ID18642
Transmission or Distribution System Owner StateMS
Grid Voltage (kV)161
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:15493

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:15493

Sources EV-6be67b47d43d5409e85d4c90
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 edd10b7e40c44e1cc866412ca348a936dbbeaa6ced60b9d654d661a121038a0f

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel