United States of America · Generation facilities

Calhoun Solar

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Invenergy Services LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.338532, -85.049019

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Calhoun Solar

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)138 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-680b8a6ca82b690056f2cf44
Detailed source fields
Original source fieldPublished value or condition
Utility ID49893
Utility NameInvenergy Services LLC
Plant Code64856
Plant NameCalhoun Solar
Street Address18768 12 Mile Road
CityBattle Creek
StateMI
Zip49017
CountyCalhoun
Latitude42.338532
Longitude-85.049019
NERC RegionRFC
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerMichigan Electric Transmission Company,
Transmission or Distribution System Owner ID56163
Grid Voltage (kV)138
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:12048

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:12048

Sources EV-680b8a6ca82b690056f2cf44
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 421dbde3162fa4f8cabcd83e408c3558755f7229ae40a8db7484ce9a3c6cebc5

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel